New construction plumbing in Hollywood typically runs roughly $600 to $1,600 per fixture, or about $4.50 per square foot for rough-in, with a whole-house system commonly landing between $8,000 and $12,000, according to Angi's cost guide. Taft Plumbing Services confirms your exact number with an upfront written quote after a walkthrough - call (954) 288-1485.
New construction plumbing is not a single line item. It covers the underground rough-in that goes in before the slab is poured, the top-out inside the framed walls, and the trim-out when fixtures are set and tested.
When cost guides from Angi and HomeAdvisor publish a whole-house figure, they are generally describing all three phases on a standard single-family home, including:
What those ranges usually do not include is the cost of the fixtures themselves. A builder-grade toilet and a designer freestanding tub take similar labor but very different material money, which is why two homes of the same size can quote thousands apart.
Fixture count beats square footage every time. An 1,800 square foot home with three full baths and an outdoor sink will cost more to plumb than a 2,600 square foot home with two baths and a simple layout.
Local conditions do not create a separate price list. They decide where in the published range your project lands.
Phase 1 - underground. Drain and sewer lines go in before the slab, get pressure tested and get inspected. This is the phase that is expensive to redo.
Phase 2 - top-out. Supply and vent piping goes in once the home is framed, before drywall, and is tested and inspected again.
Phase 3 - trim-out. Fixtures are set and commissioned at the finish stage, including toilet installation, garbage disposal installation and the water heater hookup. Our new construction plumbing in Hollywood page lays out the scope we handle from underground through final inspection.
Commercial work generally runs higher per fixture than residential. Required fixture counts are set by occupancy, pipe sizing is larger, accessibility clearances are tighter, and inspection requirements are more involved.
If you are building out a storefront, office suite or restaurant space, our commercial plumbing in Hollywood team quotes the job from the approved plan set rather than a per square foot estimate.
Published ranges are a sound way to set a budget. The only way to get your real number is a walkthrough of the plans and the site.
Taft Plumbing Services is locally owned and operated at 6565 Taft St in Hollywood, with licensed and insured plumbers and upfront, honest pricing with no hidden fees. Call (954) 288-1485 or send the service request form on our homepage, and see everything we handle on our plumbing services in Hollywood page.
Angi's cost guide puts new construction plumbing at roughly $600 to $1,600 per fixture, and that is the range most Hollywood homes fall into. Taft Plumbing Services confirms your exact number with an upfront written quote.
Usually not. Published ranges cover labor, piping and installation, while toilets, sinks, tubs and faucets are typically handled as a separate material allowance.
Payment normally follows the three build phases: underground before the slab pour, top-out after framing, and trim-out when fixtures are set. That schedule lines up with standard construction draws.
Per fixture, it generally is. Occupancy-based fixture counts, larger pipe sizing and tighter accessibility clearances all add scope to a commercial build-out.
Yes. New construction plumbing is permitted and inspected locally, and a licensed plumber should pull the permit and meet the inspector at each phase.